Search:
pixel_trans pixel_trans
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: PAMBA Downhill race
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
PAMBA Downhill race
These are a few screen grabs for some video I shot at the DH race on Saturday. They are small and not the sharpest, but better than nothing. They definately come nowhere close to being there in person. Check for the video soon, I will post ist as soon as its done. Enjoy

Last changed on 10/03/04. This album contains 10 items

This album has been viewed 879 times since 10/03/04.
pixel_trans pixel_trans
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: 2004 CORBA Mud, Sweat and Gears
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
2004 CORBA Mud, Sweat and Gears
Photos from CORBA's annual Mud, Sweat and Gears race. This year as part of the PAMBA Homegrown Race Series.

Last changed on 11/17/04. This album contains 21 items

This album has been viewed 1214 times since 10/11/04.
pixel_trans pixel_trans
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: Bovine Run Trail Photos
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Bovine Run Trail Photos
Bovine Run Trail Photos. This trail is located north west of the dam. It is all singletrack, partly wooded, partly prarie.

Last changed on 06/01/08. This album contains 22 items

This album has been viewed 1966 times since 08/01/04.
pixel_trans pixel_trans
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: 2003-2004 Cutting Hillside Trail
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
2003-2004 Cutting Hillside Trail
Pics of the CORBA trail crew cutting Hillside trail in fall of 2003 and spring of 2004.

Last changed on 09/20/05. This album contains 22 items

This album has been viewed 1222 times since 10/09/04.
pixel_trans pixel_trans
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Highlight for Album: July 2003 - Bridge Building
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
July 2003 - Bridge Building
Pics of the CORBA trail crew replacing a washed out bridge on the connector trail (the double bridges). The old bridge was damaged in a 100 year rain earlier in the month. It was still in place but weakening. As the trail crew of about 16 carried the new bridge frame across, the old bridge gave way and landed two crewmates in the water. They did the rest of the water work that day.

Last changed on 10/12/08. This album contains 36 items

This album has been viewed 1563 times since 10/09/04.
Powered by Gallery v1.4.4-pl4 RSS